TR-2 Research Reactor Operation Unit

TR-1 Research Reactor (1 MW), the very first nuclear facility installed in Turkey, had been started to operate in May 27th, 1962 and was operated until September 9th, 1977 for 15 years. A 5 MW reactor, TR-2, was installed in the same pool and started to radioisotope production to provide the increasing demand for the isotopes nationwide in 1970's.

Activities:

TR-2 Reactor Control Room

Reactor Pool

TR-2 Reactor Core (Cherenkov radiation is visible around the core)